Graupner Ready Built Queen Mary 2


Graupner Ready Built Queen Mary 2
Ref: 9105

Info
Queen Mary 2 'Queen Mary 2' is the flagship of the British Cunard Line and one of the largest cruise ships in the world.
At a formal ceremony, the Queen Mary 2 was on January 8, 2004 by Queen Elizabeth II. baptized. The maiden voyage took place between 12 January and 26 January 2004 instead and ran from her home port of Southampton on Tenerife, Gran Canaria, Barbados and the US Virgin Islands to Port Everglades in Florida.
On 19 July 2004, the Queen Mary visited 2 for the first time Port of Hamburg and went on Grasbrookhafen terminal (today Hamburg Cruise Center HafenCity) firmly. The entering port was watched by more than 300,000 spectators. It runs Hamburg regularly now and makes the Hamburg Cruise Center in HafenCity. During this time, found under the 'Queen Mary 2 Day "instead of a social program.
On the occasion of the 10th anniversary of the Queen Mary 2, Graupner / SJ brings this unique model out in the Premium Line.


Almost ready-to-run (ARTR) model
GRP hull
Superstructure made from laser-cut ABS parts
Details and small parts made from metal
Fine detailing
Lifeboats with multi-coloured paint scheme
Hull, superstructure, cranes spray-painted in matt colours
Decals applied
Four built-in electric motors
Simple installation of the RC components
Scope of delivery: model, ship stand, small parts
Info


Description

Finished model (ARTR) (Almost Ready To Run)
GRP hull
Constructions of lasered ABS parts
Details and small metal parts
Finely detailed details
Dinghy painted multicolored
Hull, superstructure, cranes with dull colors spray painted
Applied decoration
Built-in Motors
Simple installation of the RC components
Scope of delivery: model, ship stand, small parts


RC functions
Rudder
forward / reverse drive, infinitely variable
Specifications
Length overall approx approx .: 1752 mm
width oa .: 205 mm
Scale: 1: 200
total weight approx .: 7000 g
Total weight with RC: 17000 g
total height approx .: 470 mm

Price:1,515.00 (Including VAT at 20%)


Quantity:  

more info